journal-du-cameroun
Restoring the flow: CAMWATER approached final phase of critical Far North pipeline repair
By Louisa KINYUY

© Monde-Infos.net Following heavy flooding on July 19, 2026, which severely damaged the Mayo Guelling section of the long-distance pipeline supplying drinking water to Mora and Kolofata, Cameroon Water Utilities Corporation - CAMWATER rapidly deployed emergency teams to the site. Within 24 hours of the incident, technicians located the break and isolated the damaged pipe via sectioning valves to prevent excessive water loss. These swift initial hydraulic repairs stabilized the system and set ...