PERSPECTA

News from every angle

Back to headlines

Akosombo Hydroelectric Dam Fully Operational After Fire

Ghana's Akosombo Hydroelectric Dam has fully restored electricity generation, with all six turbines operational, following disruptions caused by a fire at the Volta River Authority switchyard control room.

1 May, 12:22 — 1 May, 12:22
PostShare