← Back to headlines
Bengaluru Metro Pink Line Reach-6 Corridor Inspected
The Managing Director of BMRCL inspected the Reach-6 elevated corridor of Bengaluru metro's Pink Line, overseeing the progress of the infrastructure project.
25 Feb, 14:20 — 25 Feb, 14:20
Sources
Showing 1 of 1 sources



